Projects

Amazon Delivery Station, San Salvo

Location

San Salvo (CH), Italy

Client

Engineering 2K / Isocell Amazon

Year

2021

Area

185.000 sqm

Logistics and industrial complex dedicated to goods storage and handling. Generale Prefabbricati carried out the construction of precast concrete structures, designed to ensure long spans and maximum operational flexibility. The project stands out for its large-scale dimension, rapid execution, structural optimization, and the high reliability of the construction system.

If you are interested in this project, also discover: