Polla Viaduct

Location

Salerno, Italy

Generale Prefabbricati carried out the widening of the Polla–Sicignano viaduct along the A3 Salerno–Reggio Calabria motorway.

The existing structure, located more than 50 meters above ground, was widened without interrupting traffic flows, using post-tensioning techniques. The main beams, approximately 45 meters long and over 2 meters high with I-shaped section, were prefabricated in 15-meter segments, transported to site, and assembled in situ into post-tensioned monolithic elements. The adopted technique and the expertise involved represent a significant part of Generale Prefabbricati’s internal know-how. The project was carried out using precast concrete solutions selected to ensure construction efficiency, rapid installation, and structural reliability. These solutions enabled optimization of construction phases and ensured high-quality standards throughout the execution of the project.